Constraint
A frontier model, the strongest class of language model available, still runs into 3 hard limits when given engineering work. It starts every session from nothing, since nothing carries over from what earlier sessions built. It has no way to check on its own that what it produced matches the agreed target, and it cannot coordinate with other processes that share the same state.
Training leaves these limits in place, because they fall outside a model, which ends at whatever it returns. Engineering work in production needs a surrounding layer that covers them, and that layer is where reliability is built.
CCX is the runtime that closes these limits, sitting between the model and the work an instance, a running agent, is charged with carrying out.
Manager and Worker
CCX splits the work into 2 roles that no frontier model can hold at once. The Manager, a long-lived process, carries the human-facing surface and never writes code: it listens to the operator, the person handing out assignments, then distributes them, tracks how they advance, and reports the outcome. Each assignment launches a short-lived Worker, which runs the job through specialised phases and never talks to humans. Shared state between the 2 processes lives in a durable mission log. That log outlasts crashes and even the summarising of an entire context window.
The split follows from what each role demands of a model. Managing a conversation rewards continuity and a strong recall of the operator's tone and intent, whereas completing a task rewards depth, isolation, and a readiness to reject the model's own output. When one context tries to do both, the requirements of the first bleed into the second. Separation is what keeps each role honest.
The same architecture carries recovery. If the Worker stops responding, the Manager detects it and relaunches the unit from the last verified checkpoint, so the operator never has to act as a watchdog.
The RPTIV loop
A mission unfolds across 5 phases, with a specialised sub-agent owning each one, and at every phase boundary the Worker decides whether to continue, redo the work, or escalate.
- Research
- Directed retrieval against the project's own context and live external sources, scoped to the mission.
- Plan
- Decomposition into verifiable units with explicit dependencies and acceptance criteria carried alongside.
- Test
- Acceptance criteria written before any implementation. Skipping this phase is not a path through the loop.
- Implement
- Code lands against the plan and the tests it produced.
- Validate
- Output is checked against the agreed target. Failures route back to planning.
Every loop closes at an acceptance gate of 8 points, an exit check that determines whether the work may move on: git clean, tests that pass, a build that passes, sensible commits, matching scope, matching intent, visual verification, taste questions raised.
Judging happens away from the run that produced the work, in the hands of a judge with a clean context that sees only the input, the output, and the acceptance criteria. Should a check fail, the unit stays incomplete, and the Manager reports that failure the same way it reports a success.
Safety
CCX also keeps 2 enclosures running beside every agent. The first reviews each outgoing message ahead of its delivery to the operator, filtering out content the agent must not present. The second tracks the agent's consumption of upstream APIs, the external services behind its calls, so that a single long unit cannot burn a full day's budget in one afternoon.
Both enclosures are cheap by design. The filtering runs on a small model, completes in milliseconds, and sits on the operator-facing surface, apart from the work itself. The budget meter operates at the gateway and shows the operator the ceiling before the agent can hit it. Neither is an external dependency the agent could work around.
Operator surface
When an operator first meets a CCX agent, it looks like any other, and by the tenth exchange the gap is clear. What the operator said yesterday is still there. No unit of work is marked complete before verification passes, and the refusal arrives in the same channel the assignment came through. Reviewing artefacts gives way to directing intent.
Recognition
CCX placed 4th among 227 projects entered in Built with Opus 4.6, an online hackathon run by Anthropic in February 2026. Anthropic's Claude Code team later chose CCX to be showcased at the Claude Code first birthday party, held at Shack15 in San Francisco on 21 February 2026.
Anthropic, the lab behind the Claude models, organized the hackathon with Cerebral Valley, which runs events for AI builders. The goal was to see what builders could achieve with Claude Code, the lab's coding agent, together with Opus 4.6, its newest model. More than 13,000 people applied, 500 were admitted, roughly 1 in 26, and teams of at most 2 submitted 227 projects.
Judges came from the Claude team, among them Boris Cherny, who created Claude Code, and Cat Wu. For the opening round, the scoring guide handed to participants weighted the demo at 30% of the score, with impact and use of Opus 4.6 each worth 25%, and depth of work worth 20%. A live finale brought together the 6 highest ranked projects, and the organizers promised to showcase the strongest entries at the birthday party.
The repository keeps the exact code CCX entered, untouched since the 16 February 2026 deadline, so anyone can check the runtime the judges reviewed. That runtime has kept evolving since the February 2026 submission, and our lab's agents have been running on it throughout.
Open problems
Verification too narrow: a gate checks only what it is given, so a check can validate the immediate unit while missing a parent constraint 2 levels up in the plan. The remedy is structural: parent constraints are carried into the leaf checks rather than reconstructed there.
Cross-agent drift: when 2 agents share a project, they can end up with incompatible plans. Each keeps a private account of project state, drawn from a stale snapshot, until those accounts split the work into 2 conflicting versions. This coordination problem lies beyond any single runtime. Grove, the lab's other release, answers it with one memory that all agents read and that 1 agent alone writes.